
Design Build Statewide
PROJECT OWNER
LOCATION
CLIENT(s)
SERVICES PROVIDED
As a subconsultant to WSP, SJH provided design oversight and design quality assurance services. Specific tasks included performing Quality Assurance activities of the Engineer of Record’s Quality Control Plans, conducting final reviews of Design-Builder submittals for project designs prior to release for construction—including drawings, specifications, reports, calculations, and other contract-required documents related to geotechnical, structural, and civil engineering—to ensure compliance with all NYSDOT policies, manuals, engineering bulletins, RFP documents, and engineering instructions. SJH also reviewed temporary structure submittals, including plans and calculations.
-
D900050 Van Wyck Expressway Capacity and Access Improvements to JFK Airport
Contract 2 (PIN X735.83) – Fee: $331K, Construction Cost: $318M -
D900049 Lower Westchester Bridge Bundle
(PIN 8101.46) – Fee: $70K, Construction Cost: $115M -
D900046 I-390 Interchange Improvements at I-490, Stages 3 and 4
(PIN 4390.54) – Fee: $64K, Construction Cost: $86M
SJH complied with the accepted document control system and maintained the administrative record for project design oversight and quality assurance activities on the tasks involved.
RELATED PROJECTS


