
Hunts Point Access
PROJECT OWNER
LOCATION
CLIENT(s)
SERVICES PROVIDED
SJH is part of the Hunts Point Access Improvement design-build team. The plans for this $460M phase of the project include improvements to the Robert F Kennedy Bridge and the New England Thruway by adding new entrance and exit ramps. The overall project goal is to provide a better traffic flow for the approximate 78,000 vehicles traveling daily to and from the peninsula and the nearby Hunts Point Food Distribution Center. SJH was responsible for design packages including: (1) Ramp SE, a single-span ramp structure with highly irregular framing, a sharp skew angle and an integral abutment design; (2) water main protection structure, a 36’ span 3-sided precast culvert on steel H-piles; (3) Bryant Ave Pedestrian Bridge; (4) retaining and curtain walls including CIP concrete wall, T-wall and anchored soldier pile/precast lagging wall; (5) overhead sign structures; (6) QA/QC of design.
RELATED PROJECTS